Tag Archives: plumbing

Camp Hill Kitchen Remodel

Eastgate Kitchen

 

We just completed this kitchen remodel at a Camp Hill home. Not all remodels have to start from scratch to update and really enhance the room’s appearance…

Utilizing the existing cabinetry we installed new Formica countertops, faucet, and sink. Combine those small changes with a new subway tile backsplash, and you have a bright and inviting area to cook!

Full Kitchen Remodel

 

We recently completed this full kitchen remodel at a Harrisburg home. The scope of work included making multiple wall alterations, installing all new cabinetry, modifying the island to include an eat-in style countertop with undermount sink, new flooring, replace all lighting fixtures and adding new pendant lights, then painting!

After Hours Emergency Service

Plumbing Repair

Have an issue that just won’t wait for normal business hours? We offer emergency service during evenings and weekends to get you through those fun times!

This is a water line that we repaired in a ceiling at a Hummelstown home today. Once the ceiling is all patched and painted… you won’t be able to tell that there was ever a problem.

Complete Full Bath Renovation

(Click on images to enlarge, hit back to return)

This full bathroom renovation involved installing a new Kohler deep soaking tub surrounded by ceramic and mosaic tile, new plumbing fixtures, and a shower door.
A new commode, vanity, and mirror were also installed. The floor was redone with a classic 12″ ceramic tile. Everything was finished off with a fresh coat of paint!

 

Here are some pictures from the beginning and during the project:
Full Bath Renovation Mid Project Full Bath Renovation Mid Project Full Bath Renovation Mid Project
(Click on images to enlarge, hit back to return)

Complete Master Bath Renovation

(Click on images to enlarge, hit back to return)


This master bathroom project involved repositioning and installing a walk-in shower with new plumbing and fixtures. Glass mosaic tile was used for the shower and rear wall that continues around to the vanity backsplash. The partition wall was modified from an old full wall, and a new vanity with marble top was installed.The floor was also redone with a modern styled ceramic tile.

 

Here are some pictures of the bathroom before and during construction:
Master Bath Renovation Before Master Bath Renovation Mid Project Master Bath Renovation Mid Project
(Click on images to enlarge, hit back to return)

Hershey Bathroom Renovation

We’re almost wrapped up with this Hershey bathroom renovation. The new pocket door, new closet, tub, and surround are installed. All that’s missing is some paint to finish it off!

Heat Pump Replacement

We just installed this new heat pump system at a home in Etters.

Plumbing Repair – Start to Finish

A recent plumbing repair we completed, start to finish.

Foreclosure Bathroom Remodel

This bathroom was a complete remodel we are working on in a foreclosed home for an investor. New vanity, faucet, lighting, mirror, commode, and tub surround were installed.

Commercial Office Conversion

We converted a commercial office building in Elizabethtown into a residential apartment. The project lasted several months, and consisted of a completely demolishing and re-framing the interior, building all new living and dining rooms as well as re-wiring and re-plumbing for a kitchen, bathroom, and laundry room.

Here are the ‘before’ images:

 

Here are the ‘after’ images:

New Home Heat Pump Installations

We installed 2 and 5 ton Carrier Heat Pumps at a new-construction home in Harrisburg.

Mechanical repairs for an investment property

We installed a new air conditioning unit and water heater at an investor’s Harrisburg property.